Tiny house
This type of modular house consumes energy economically, but provides long-term comfortable living. It can function as: a vacation home, a guest house, a summer house, or in any other way you need.
Technical characteristics
Appointment
96
Area
3,1
Height
56
Person
Over all dimensions of the building (LxWxH): 6.8 x 2.55 x 2.5 m
Ceiling height: 2.5 m
Building floor: 2 floor
Total area of the building: 25,81 m2
Terrace dimensions: additional option
Production period: 30 working days

Our buildings are sustainable, reliable and environmentally friendly.

Lead time from order to installation - from 1 to 3 months
Ready project
Specification and price
The cost of a modular house depends on the content of the equipment.
Casco
 Base
Full
Your home - anywhere
The technologies we utilize enable us to install our modular homes even in locations with harsh winters, consistent precipitation, unpredictable and changing weather conditions. Our approach allows you to not worry about the house and set it up wherever you desire.
Your personal design
Modular houses allow you to realize any interior design options, any style. We can implement our design, but if you want, you can make your own design project, choose finishing materials and appliances.
Leave your phone number and our expert will answer all your questions
Interested in modular house?
Send
Frequently asked questions
Stages of modular home installation:
The time required for manufacturing and installation of the homes is typically 4-8 weeks.
1
Designing
  • Development and approval of the house project.
  • Manufacturing of modules according to the project.
  • Installation of necessary systems in the modules (electrical wiring, plumbing, heating, etc.).
  • Production of modules.
2
Preparation works
  • Determining the location of the house and obtaining the necessary construction permits.
  • Site preparation, including vegetation removal, leveling the terrain, and foundation installation.
3
Transportation of modules:
  • Transporting the modules to the construction site.
  • Developing and implementing the installation plan.
4
Module installation
  • Installing the foundation for the modular building.
  • Connecting the modules using bolts and brackets.
  • Installing the roof, facade, and windows.
5
Connection of utilities
  • Connecting electrical wiring, water supply, heating, and other utilities to the house.
  • Establishing external infrastructure such as sewage systems and gas tanks.
6
Interior work
  • Completing interior works, including door installation, flooring, wall finishes, and plumbing fixtures.
  • Connecting electrical appliances and household equipment.
7
Project completion
  • Conducting final inspections and system adjustments.
  • Signing the acceptance certificate and obtaining the occupancy permit for the house.
Products
  • Tiny house
  • Fachwerk
  • Modular houses
  • Saunas
Information
  • About Us
  • Technology
Do you want us to call you back?
© 2023 ModuHoumes