Saunas
Have you been dreaming of having your own sauna for a long time? Our experts have developed a solution that will satisfy even the most demanding clients. Our saunas can be designed for private use or as part of your business venture.
Technical characteristics
Appointment
8-16
Area
3,1
Height
2-6
Person
Exterior
Drawings
Interior
Over all dimensions of the building (LxWxH): 3.4 x 2.3 x 2.5 m
Ceiling height: 2.5 m
Building floor: 1floor
Total area of the building: 8m2
Terrace dimensions: additional option
Production period: 30 working days

Our buildings are sustainable, reliable and environmentally friendly.

Lead time from order to installation - from 1 to 3 months
Exterior
Drawings
Interior
Over all dimensions of the building (LxWxH): 3.6 x 2.6 x 2.5 m
Ceiling height: 2.5 m
Building floor: 1 floor
Total area of the building: 9.4 m2
Terrace dimensions: additional option
Production period: 30 working days

Our buildings are sustainable, reliable and environmentally friendly.

Lead time from order to installation - from 1 to 3 months
Exterior
Drawings
Interior
Over all dimensions of the building (LxWxH): 3.6 x 2.6 x 2.5 m
Ceiling height: 2.5 m
Building floor: 1 floor
Total area of the building: 16 m2
Terrace dimensions: additional option
Production period: 30 working days

Our buildings are sustainable, reliable and environmentally friendly.

Lead time from order to installation - from 1 to 3 months
Specification and price
The cost of a modular house depends on the content of the equipment.
Casco
 Base
Full
Your home - anywhere
The technologies we utilize enable us to install our modular homes even in locations with harsh winters, consistent precipitation, unpredictable and changing weather conditions. Our approach allows you to not worry about the house and set it up wherever you desire.
Leave your phone number and our expert will answer all your questions
Interested in modular house?
Send
Stages of modular home installation:
The time required for manufacturing and installation of the homes is typically 4-8 weeks.
1
Designing
  • Development and approval of the house project.
  • Manufacturing of modules according to the project.
  • Installation of necessary systems in the modules (electrical wiring, plumbing, heating, etc.).
  • Production of modules.
2
Preparation works
  • Determining the location of the house and obtaining the necessary construction permits.
  • Site preparation, including vegetation removal, leveling the terrain, and foundation installation.
3
Transportation of modules:
  • Transporting the modules to the construction site.
  • Developing and implementing the installation plan.
4
Module installation
  • Installing the foundation for the modular building.
  • Connecting the modules using bolts and brackets.
  • Installing the roof, facade, and windows.
5
Connection of utilities
  • Connecting electrical wiring, water supply, heating, and other utilities to the house.
  • Establishing external infrastructure such as sewage systems and gas tanks.
6
Interior work
  • Completing interior works, including door installation, flooring, wall finishes, and plumbing fixtures.
  • Connecting electrical appliances and household equipment.
7
Project completion
  • Conducting final inspections and system adjustments.
  • Signing the acceptance certificate and obtaining the occupancy permit for the house.
Frequently asked questions
Products
  • Tiny house
  • Fachwerk
  • Modular houses
  • Saunas
Information
  • About Us
  • Technology
Do you want us to call you back?
© 2023 ModuHoumes